GASLOCK PRODUCTS
- Traveling Valve
- Standing Valve
- SJB Tool
 
SOLID CONTROL PLUNGER
- Cyclone Pump Plunger
- Cyclone E-VAC Pump Sys..
- Cyclone Super 92 Plunger
 
CORROSION MONITORING
- True Test Tool
- True Test MR300
- Model E-1
- Model E-3
- Model E-3X
- Model E-5
- Model E-5X
- Vent Cage
 
HARD COATINGS
- E-CARBON
 
True Test Tool MR300

True Test MR300 Downhole Corrosion Monitoring Tool
Catch your corrosion problem BEFORE failure or damage occurs!

Why should I be conducting routine corrosion analysis?

Routine corrosions analysis will catch problems early. Coupon tests are low in cost, simple to conduct, and allow the simultaneous evaluation of numerous materials and variations of a single material. Coupon tests are easily adapted to evaluate specific types of corrosion.

How often do I need to test?

In many cases, it will be worthwhile to evaluate the effects of corrosion thru timed exposure. This can be done by means of a controlled interval test which will establish a base rate. Testing intervals establish base corrosion rates and severity of well conditions. Recommended testing periods range from 1-30 days depending upon severity of well conditions. For your specific testing needs contact a corrosion engineer or an Eagle representative.

What will the True Test MR300 tell me that my deteriorated equipment won't?

Coupon testing remains a powerful tool in the corrosion engineers tool kit. Use of the True Test MR 300 provides quantitative data thru wieght loss measurement which can be used to develop sound chemical treatment programs.

What makes the True Test MR300 the best tool for my corrosion monitoring needs?

Previously, corrosion monitoring was routinely accomplished by placing weight loss coupons in the system on or near the well head. The information compiled from this location is not representative of subsurface corrosion conditions effecting downhole tubulars and pumps. Now, with the Eagle True Test, corrosion rates downhole can be established during routine testing of your well, thus enhancing the results of your corrosion treatment programs.

  • Identifying severity of corrosion on problem wells

  • Reducing frequent pulling cost caused by corrosion

  • Identify current corrosion versus previous corrosion

  • Maximizing chemical effectiveness

  • Optimizing downhole equipment replacement cost

  • Substantially increasing service life

Application

Standard models are recommended to be used in:

  • Gas Wells

  • Injection Wells

  • E.S.P Wells

Specifications
Size Model MR300 Dimensions Mam Recommended Makeup
-A- -B-
5/8 1-312 15 5/8 1 5/16 112 ft./lbs.
5/8 1-625 15 5/8 1 5/8 112 ft./lbs.

The True Test MR300 can be placed into service by Standard Wireline procedure & can be positioned at any depth by utilizing common wireline locking mandrels (collar lock, slip lock, nipple lock.)

Run by itself or with other wireline tools, the True Test MR300 will deliver exact downhole corrosion information. For convenience and improved economics, run with your temperature and pressure survey memory tools.

The True Test MR300 is equipped with multiple monitoring probes for testing corrosion on various metals. Bio-probes can also be included during a normal test for bacteria-related corrosion information.

Request Literature


HOME | ABOUT USOUR PRODUCTS | REQUEST LITERATURE | CONTACT US | TESTIMONIALS

 

Contact Info: p. (435) 656-0505 • f. (435) 628-9069 • Mford@infowest.com • 2716 RioVista Lane - St. George, Utah - 84790